Haven Robotics · Drawing set 002 · On-site siding cutter
The bottleneck in siding installation is measuring and cutting. We’re building the cutter that takes it off your crew.
It is an on-site cutter for fiber-cement and engineered-wood lap siding. It sets up beside the wall, someone calls the length, and it makes the cut. Your crew hangs. This set shows a filmed crew day, the machine, and what it does not do yet. The last sheet is a pilot request.
REV B · Prototype in development
- Drawn by
- J. Matheson, EE
- Program
- BYU/USU Sandbox
- Tolerance
- ±2 mm target
- Service area
- Utah first
How time is spent on the job site
- We filmed one siding crew on a live job and logged what each person did.
- Measuring and cutting by hand took 16.6% of the day. Waiting or idle took another 21.7%.
- Placing the siding took 24%. The rest is the wall, moving material, talking, setup and cleanup.
- With the cutter, modeled: cutting by hand drops to 1.7% and waiting to 7.0%.
- The crew finishes 30% sooner. A model of a filmed job, scaled to a full workday.
Haven time study, one Utah siding contractor. One crew filmed on a live job, scaled to a full workday on the assumption that the unfilmed hours look like the filmed ones. The cutter bar is modeled. Measuring at the wall stays with your crew. Each bar adds to 100.
SHT 02 · The machine · Proposed
Rail, collar, saw
A long rail beam on folding legs sits beside the wall with the planks on it. A collar crawls along the beam and stops at the length. A circular saw head crosscuts the plank.
It is a tool for your crew. Someone still calls the length and your installers still hang every piece.
Prototype in development. The CAD model, drawings and 3D-printed parts exist today. The images on this page are renders.
SHT 03 · The cut
Scroll to make the cut
The collar crawls to the length.
The saw head feeds across the plank on a rail in the collar’s top beam.
The automated cutter maintains a 2 mm tolerance.
TOL ±2 MM TARGET
Positions from the CAD motion plan. Not a measurement.
What it does, and what it doesn’t yet
Fiber cement and engineered wood
James Hardie and LP SmartSide lap siding, trim and battens, cut to length on the jobsite.
Long planks
Planks up to 16 ft for LP SmartSide and 12 ft for Hardie.
Board and batten boards
We are adapting the design to cut the boards used in board and batten. 4x8 sheets are still out of scope. If board and batten is a large share of your work, say so on the request form.
Haven keeps the machine
You lease it for 12 months. Haven services it, and any downtime is added to the end of your lease.
30 to 40% faster installs
Contractors often guess higher. We quote under it.
A sensor that reads the wall
Today a person calls the length, the way your crew does now. A sensor that measures the as-built wall (framing never matches the plans) is the next add-on.
The cutter is machine one. We are building toward a robot that installs the siding too, and it starts with the cut.
Request a pilot slot
We bring the machine to one or two of your jobs, run it with your crew, and hand you a report of the labor time it saved. We are pre-launch, so the first round is small.
- Weeks 1 and 2: we run the machine
- Weeks 3 and 4: your crew runs it while we watch
- The pilot fee is non-refundable and counts toward a 12-month lease if you sign within 60 days
- The fee is quoted on a call
Received. Josh or Vin will follow up.